Independent NFPA 110 Compliance Experts

NFPA 110 Compliance.
Assessment to Remediation.

Independent compliance assessment, full remediation, and vendor-agnostic solutions. We handle everything from documentation review to equipment installation, with no manufacturer loyalty and no conflicts of interest.

6+
Years EPS Experience
72hr
Report turnaround
100%
Independent — no conflicts
Common Compliance Gaps We Solve
NFPA 110 Requirements
Typical Deficiency Areas
ATS Transfer Time10s max required
Load Bank TestingAnnual requirement
Fuel System / ContainmentEnvironmental compliance
Maintenance RecordsDocumentation required
6+
Years EPS experience
72hr
Report turnaround
8
Southeast states served
100%
Vendor-agnostic approach
NFPA 110 Level 1 Compliance
CMS Emergency Power Requirements
ATS Transfer Time Verification
Load Bank Testing Documentation
Nursing Home EPS Assessment
Pharmaceutical Backup Power
Financial Institution Compliance
72-Hour Report Turnaround
Southeast Region Experts
NFPA 110 Level 1 Compliance
CMS Emergency Power Requirements
ATS Transfer Time Verification
Load Bank Testing Documentation
Nursing Home EPS Assessment
Pharmaceutical Backup Power
Financial Institution Compliance
72-Hour Report Turnaround
Southeast Region Experts
The Gap

Your Generator Runs.
But Does It Comply?

There is a fundamental difference between a generator that starts and an Emergency Power System that meets NFPA 110. Most facilities have gaps in their compliance posture — missing documentation, untested transfer times, or aging equipment that doesn't meet current standards.

NFPA 110 Level 1 facilities must maintain complete documentation, verify transfer times, perform annual load bank testing, and ensure proper equipment maintenance. These aren't optional — they're regulatory requirements for any facility where power failure creates a life-safety risk.

NFPA110Compliance.com provides independent compliance assessment and full remediation. We identify every gap, help you understand the requirements, and implement solutions. We work vendor-agnostic — no loyalty to any manufacturer or contractor — so the solution matches your actual needs.

01
ATS Transfer Time Failures
NFPA 110 Level 1 requires transfer within 10 seconds. Most facilities have never verified their ATS transfer time with documentation. Many exceed 10 seconds without knowing it.
02
Missing Load Bank Test Records
Annual 100% rated load tests are required. Absence of a certified test report is a direct citation. Most facilities are 2–4 years overdue and don't realize it until a surveyor asks.
03
Incomplete Maintenance Documentation
Weekly, monthly, and semi-annual records must be maintained in a specific format. Missing entries and unsigned logs don't satisfy NFPA 110 Section 8.3.7 requirements.
04
Fire Separation Deficiencies
EPS equipment rooms require 2-hour fire-rated separation. Unsealed conduit penetrations and improper door assemblies are among the most cited — and easiest to fix — findings.
Who We Serve

Built for High-Stakes
Regulated Facilities

We focus on facilities where power failure is not an inconvenience — it's a life-safety or catastrophic loss event. Every assessment is written to the specific regulatory framework governing your facility type.

01
🏥
Skilled Nursing Facilities
CMS requires strict NFPA 110 compliance for all certified SNFs. Our assessments address the specific requirements of F-Tag 517, including ATS transfer times, load bank testing, and maintenance documentation standards.
CMS F-Tag 517NFPA 110NFPA 99
02
🏠
Assisted Living & Memory Care
State licensure agencies conduct life-safety inspections requiring NFPA 110 compliance. We help facilities understand state-specific requirements and maintain documentation that demonstrates ongoing compliance.
State DHSRNFPA 110Life Safety Code
03
💊
Pharmaceutical Facilities
Pharmaceutical manufacturing and storage facilities require validated, documented backup power. FDA 21 CFR Part 211 requires compliance with NFPA 110 standards. We provide assessment and remediation specific to cold storage and controlled environment requirements.
FDA 21 CFR 211USP 797/800NFPA 110
04
🏦
Financial Institutions
FFIEC and OCC guidelines require documented emergency power for data centers and branch operations. Examiners are increasingly scrutinizing backup power documentation during safety exams.
FFIEC BCPOCC HandbookNFPA 110
05
🏗
Senior Independent Living
High-rise senior communities rely on emergency power for elevators, fire alarms, and life-safety systems. NFPA 110 compliance is required by IBC and enforced by local AHJs.
IBC Chapter 27NFPA 110Local AHJ
06
🏨
Hospitals & Outpatient Clinics
TJC and CMS deeming authority apply NFPA 99 and NFPA 110 together. We work through the full EC.02.05 chapter and produce documentation that survives TJC surveys.
TJC EC.02.05NFPA 99NFPA 110
Our Services

Assessment to
Full Remediation

From assessment through complete remediation, every engagement is structured around one goal: a facility that is fully compliant and stays that way. We provide vendor-agnostic solutions — assessment, remediation, equipment installation, testing, and ongoing management.

Phase 1
Compliance Assessment
Request Quote
Complete NFPA 110 documentation review and findings report. The essential starting point for any facility that wants to know exactly where they stand before a survey.
What's Included
  • Full NFPA 110 compliance scorecard (6 categories)
  • Critical and moderate findings with code citations
  • Corrective action timeline (30/60/90 day)
  • AHJ-ready documentation summary
  • 72-hour report delivery
  • 30-minute findings review call
Start Assessment
Phase 2
Remediation & Implementation
Custom Scope
Phase 1 plus everything needed to close findings. We handle remediation end-to-end: equipment upgrades, ATS replacements, generator installations, load bank testing, OM&T program creation. Vendor-agnostic — we source the right solution for your facility.
Everything in Phase 1, Plus
  • ATS swaps and transfer time verification
  • Generator installation and commissioning
  • Load bank testing (100% rated load)
  • Temporary/rental generator coordination
  • Written NFPA 110 OM&T program development and implementation
  • AHJ coordination and code interpretation letters
  • Facility-specific maintenance schedule and staff training
  • On-site re-inspection and compliance sign-off
Get a Quote
Annual Program
Ongoing Retainer
Annual Program
Continuous compliance assurance. We stay engaged year-round so your documentation never falls behind and every survey is expected, not feared.
Annual Retainer Includes
  • Annual load bank test witnessing
  • Quarterly compliance check-ins
  • Maintenance record review and gap alerts
  • Survey readiness review (30 days pre-survey)
  • Priority response to citations or AHJ notices
Learn More
Enterprise / Multi-Site
Managing 3 or more facilities?
Unified compliance program, single point of contact, master documentation, significant per-site savings. Regional operators, hospital systems, healthcare REITs — contact us for custom pricing.
Contact for Pricing
How It Works

Simple. Fast. Defensible.

No site visit required for Phase 1. We review your documentation, identify every deficiency, and deliver a report you can act on — in under 72 hours.

01
Submit Intake
Complete the 5-minute online form. Facility type, generator systems, regulatory authority, known concerns. No commitment required.
Under 5 minutes
02
Document Upload
We send a secure upload request for your maintenance logs, test records, and equipment specs. Upload what you have — we identify what's missing.
Same day
03
Expert Review
We review your documentation against NFPA 110 requirements and your facility's specific regulatory framework. Every finding cross-referenced to the exact code section.
24–48 hours
04
Report Delivery
Complete assessment report with scorecard, findings with code citations, corrective action timeline, and a findings review call. Actionable from day one.
Within 72 hours
Straightforward Pricing. No Hidden Fees. Every engagement starts with a clear scope and a fixed quote. You'll know exactly what you're getting and what it costs before we begin.
Free — No Obligation

Get Your Compliance
Assessment Started.

Answer 5 questions about your facility. We'll respond within one business day with a preliminary assessment of your compliance posture at no charge. It's a no-pressure conversation to help you understand where you stand.

Response within 1 business day
No commitment, no sales pressure
Specific to your facility type and regulatory authority
Based on NFPA 110 (2021 Edition)
Free Risk Assessment Request
We respond within 1 business day. Your information is never shared or sold.
Why NFPA110Compliance.com

Built on Real Experience

Industry Knowledge
Our team brings years of hands-on EPS experience — from generator commissioning to ATS testing to CMS survey preparation. We know what surveyors look for because we've seen it from the equipment side.
Vendor-Agnostic Solutions
We provide assessment, remediation, equipment installation, and maintenance management — but we're not locked to any generator manufacturer or contractor. The solution is whatever actually fixes your problem, matched to your facility's specific needs.
Southeast Focus
We work the states where CMS survey activity is highest and citation volume is growing — AL, GA, FL, MS, TN, NC, SC, LA. We know the AHJs, the code interpretations, and the local inspection patterns.
72hr
Report turnaround
100%
Vendor-agnostic approach
8
Southeast states covered
$0
Manufacturer loyalty or conflicts
Common Questions

Everything You
Need to Know

Questions not covered here? Reach out directly — we respond to every inquiry within one business day.

Ask a Question

No. NFPA110Compliance.com is an independent third-party compliance consulting firm with no affiliation, endorsement, or connection to the NFPA. We are a private consulting company that specializes in helping regulated facilities achieve compliance with the NFPA 110 standard. NFPA 110 is a published standard; consulting services based on it are provided by independent experts.

No. Phase 1 is a documentation review completed remotely. You upload your existing maintenance records, test logs, and equipment specifications to our secure portal. We review against NFPA 110 requirements and deliver your report within 72 hours. Site visits are available for Phase 2 engagements.

That is the most common situation we encounter. Missing documentation is itself a finding. We review what you have, identify every gap, and provide a complete picture including what records need to be created or obtained. Most facilities don't realize how much is missing until we show them.

Passing a survey means the surveyor didn't find a deficiency on that day — not that you're fully compliant. NFPA 110 requires ongoing compliance, not point-in-time compliance. Equipment ages, records fall behind, and requirements update. Proactive compliance is less expensive than reactive correction.

Yes. Our primary focus is the Southeast — Georgia, Alabama, Florida, Louisiana, North Carolina, Tennessee, and Mississippi — but we serve facilities nationwide. The Phase 1 documentation review is fully remote and applicable to any facility subject to NFPA 110 regardless of location.

Level 1 applies when failure of the EPS could result in loss of life or serious injury — this includes most nursing homes, hospitals, and healthcare facilities. Level 1 has the strictest requirements: 10-second maximum transfer time, annual 100% load bank testing, and rigorous documentation requirements.

Ready to Get Started?

Full-Service NFPA 110
Compliance Solutions.

Assessment, remediation, equipment installation, testing, and ongoing management. We provide the complete solution to ensure your facility is compliant and stays that way.

Response within 1 business day. No commitment required.